Assessment on Factors Affecting the Performance of Public Funded Energy Construction Projects in Rwanda
Abstract
Keywords
Full Text:
PDFReferences
Abdullah, M. R., Rahman, I. A., & Azis, A., (2010) Causes of delay in Mara Management Procurement Construction Projects Journal of Surveying, Construction and Property, 1(1), pp.123 – 138
Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M., (1995) Causes of delay in large building construction projects Journal of Management in Engineering,11(2), pp.45 – 50
Frimpong, Y., Oluwoye, J., & Crawford, L., (2003). Causes of delay and cost overruns in construction of groundwater projects in developing countries; Ghana as a case study International Journal of Project Management, 21, pp.321 32
Hoai, L. L., Lee, Y. D., & Lee, J. Y., (2008) Delay and cost overruns in Vietnam Large construction projects: a comparison with other selected countries. KSCE Journal of Civil Engineering, 12(6), pp.367 – 377.
Kirakowski, J. (2000, June 2nd). Human Factors Research Group. Retrieved from University College, Cork : www.ucc.ie
Kothari, C. R. (2004). Research Methodology: Methods and Techniques (2nd Revised Edition ed.). New Delhi, India: New Age International Publishers.
Le-Hoai,L.,Lee,Y. D., & Lee, J. Y., (2008). Delay and cost overruns in Vietnam large construction projects: a comparison with other selected countries, KSCE Journal of Civil Engineering, Vol 12(6), pp. 367-377
Memon, A. H. (2014). Contractor perspectives on time overrun factors in Malaysian construction projects International Journal of Science, Environment and Technology, 3(3), pp.1184 – 1192
Memon, A. H., Rahman, I. A., & Azis. A. A. A., (2012) Time and cost performance in construction projects in southern and central Regions of peninsular Malaysia. International Journal of Advances in Applied Sciences, 1(1), pp.45 – 52.
Mugenda, M., & Mugenda, G. A. (2003). Research Methods: Qualitative and Quantitative Approach. Nairobi: Laba Graphics Services. 14
Orodho, A. (2003). Elements of Education and Social Sciences: Research Methods
Owolabi, J. D., Amusan, L. M., Oloke, C. O., Olusanya, O., Tunji, O. P., Owalabi, O. I., (2014) Causes and effects of delay on project construction delivery time International Journal of Education and Research, 2(4), pp.197 – 208
Pallant, J.(2005) SPSS survival manual: A step by step guide to data analysis using SPSS for windows (version 12) Sydney: Allen & Unwin Project Management Institute, (2008) A Guide to the Project Management Body of Knowledge (PMBOK), Vol. 4, pp.36, Ravisankar, K. L., Anandakumar. S., & Krishnamoorthy, V., (2014) Study on the quantification of delay factors in construction industry.
International Journal of Emerging Technology and Advanced Engineering, 4(1), pp.105–113 Ricardo, T. (2005) Sample design techniques (2nd ed) New Delhi: Tata McGraw Hill.
Refbacks
- There are currently no refbacks.
Copyright© 2015 Journal of Research in Business, Economics and Management. All rights reserved.
ISSN 2395-2210
For any help/support contact us at editorial@scitecresearch.com, jrbem@scitecresearch.com.