Assessment on Factors Affecting the Performance of Public Funded Energy Construction Projects in Rwanda

Anicet Mushuti, Dr. Kule Julius Warren, Dr. Ndengo Marcel

Abstract


The main purpose of this study was to assess the factors that affect the performance of public funded energy construction projects in Rwanda using a survey of the seven (7) micro hydropower project (7 MHP). The objectives of the study included; to examine the effect of project size on performance of the 7 MHPs, to assess the effect of project procurement methods on the performance of the7 MHPs, to establish the contribution of project budgetary allocation on the performance of the 7 MHPs, to assess the effect of project management skills/competences of managers on the performance of the 7 MHPs Using a descriptive case study design and purposive sampling technique, 53 respondents were selected. A Likert scale questionnaire was used for data collection and the data analyzed by way of SPSS version 20 into tables. Results indicated that Project size and project procurement methods were positively correlated with project performance of the 7MHPs. A normal regression analysis performed to assess the predictive power of project management skills of managers, Project budget, Project complexity, Procurement methods found that these variables account for 48.4% (R squared 0.484) variance in the performance of the 7 MHPs. Thus, these variables were found to be statistically significant in predicting performance. The study recommends further analysis on the effect of project budget allocation and project on performance since results show that these variables are negatively correlated with performance of the 7 MHPs.

Keywords


Project Size; Project Procurement; Project Budget; Project Management Skills; Project Performance.

Full Text:

PDF

References


Abdullah, M. R., Rahman, I. A., & Azis, A., (2010) Causes of delay in Mara Management Procurement Construction Projects Journal of Surveying, Construction and Property, 1(1), pp.123 – 138

Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M., (1995) Causes of delay in large building construction projects Journal of Management in Engineering,11(2), pp.45 – 50

Frimpong, Y., Oluwoye, J., & Crawford, L., (2003). Causes of delay and cost overruns in construction of groundwater projects in developing countries; Ghana as a case study International Journal of Project Management, 21, pp.321 32

Hoai, L. L., Lee, Y. D., & Lee, J. Y., (2008) Delay and cost overruns in Vietnam Large construction projects: a comparison with other selected countries. KSCE Journal of Civil Engineering, 12(6), pp.367 – 377.

Kirakowski, J. (2000, June 2nd). Human Factors Research Group. Retrieved from University College, Cork : www.ucc.ie

Kothari, C. R. (2004). Research Methodology: Methods and Techniques (2nd Revised Edition ed.). New Delhi, India: New Age International Publishers.

Le-Hoai,L.,Lee,Y. D., & Lee, J. Y., (2008). Delay and cost overruns in Vietnam large construction projects: a comparison with other selected countries, KSCE Journal of Civil Engineering, Vol 12(6), pp. 367-377

Memon, A. H. (2014). Contractor perspectives on time overrun factors in Malaysian construction projects International Journal of Science, Environment and Technology, 3(3), pp.1184 – 1192

Memon, A. H., Rahman, I. A., & Azis. A. A. A., (2012) Time and cost performance in construction projects in southern and central Regions of peninsular Malaysia. International Journal of Advances in Applied Sciences, 1(1), pp.45 – 52.

Mugenda, M., & Mugenda, G. A. (2003). Research Methods: Qualitative and Quantitative Approach. Nairobi: Laba Graphics Services. 14

Orodho, A. (2003). Elements of Education and Social Sciences: Research Methods

Owolabi, J. D., Amusan, L. M., Oloke, C. O., Olusanya, O., Tunji, O. P., Owalabi, O. I., (2014) Causes and effects of delay on project construction delivery time International Journal of Education and Research, 2(4), pp.197 – 208

Pallant, J.(2005) SPSS survival manual: A step by step guide to data analysis using SPSS for windows (version 12) Sydney: Allen & Unwin Project Management Institute, (2008) A Guide to the Project Management Body of Knowledge (PMBOK), Vol. 4, pp.36, Ravisankar, K. L., Anandakumar. S., & Krishnamoorthy, V., (2014) Study on the quantification of delay factors in construction industry.

International Journal of Emerging Technology and Advanced Engineering, 4(1), pp.105–113 Ricardo, T. (2005) Sample design techniques (2nd ed) New Delhi: Tata McGraw Hill.


Refbacks

  • There are currently no refbacks.


 

Copyright© 2015 Journal of Research in Business, Economics and Management. All rights reserved.

ISSN 2395-2210

For any help/support contact us at editorial@scitecresearch.com, jrbem@scitecresearch.com.